Louisiana National Guard Multi Unit Readiness Center, Hammond, Louisiana

Project Name: Louisiana National Guard Multi Unit Readiness Center

The Parking lot is to the right when facing the Readiness Center’s entrance.

The Grasspave2 parking lot has a concrete border to separate the Grasspave2 from the unsupported turf.

Newly sodded area of the Grasspave2 parking lot.

The 73,530 sq ft parking lot will also reduce the urban heat island effect through transpiration.

Light posts are easily integrated into a Grasspave2 parking area. Trees, shrubs, irrigation heads, and other items can also be easily integrated.

Here we see the concrete apron surrounding the Grasspave2 parking lot. The concrete and the Grasspave2 are very level in elevation.

The grass area around the building would make a nice Grasspave2 firelane.

Product: Grasspave2 reinforced grass parking lot

Application: Porous Parking Lot

City: Hammond

State/Province: Louisiana

Install Date: Fall 2008

Install Size: 6,830 m2 (73,530 sq ft)

Address: 1501 Industrial Park Drive Hammond, Louisiana  70401

Client: Louisiana National Guard

Designer: Holly & Smith Architecture- Hammond, Louisiana

Contractor: Richard Price Construction.- Walker, LA

Directions: Take LA 3158 north off I- 12 to LA 190 go east to Industrial Park Drive then Turn left. Go to the Guard shack on the left (first concrete road to the left) GO .4 miles after you go thru the guard shack and the building will be on your right.

Location: The Grasspave2 parking lot is on the right when you are facing the building.

Photography: Roger Tadlock, MKM Sales

Summary: The large parking lot will house military and civilian automobiles. The LNG needed Grasspave2 to get the parking it required and also the stormwater management properties available from the grass porous paver.

This entry was posted in Grasspave2, Louisiana and tagged , , , , , . Bookmark the permalink.

Comments are closed.