Uhaul, Chandler, Arizona

Project Name: Uhaul

The entrance the the RV and overflow parking area.

Gravelpave2 on the base course partially filled with gravel.

Gravelpave2 being unrolled and anchored to the base course.

The completed installation.

Unfilled Gravelpave2 is snap-fit together to an adjacent roll, making one single contiguous system.

Porous Gravelpave2 meets the impervious surface.

Product: Gravelpave2 porous parking lot

Application: Parking Lot

City: Chandler

State/Province: Arizona

Install Date: July 2008

Install Size: 3,500 m2 (36,000 sq ft)

Address: 24908 South Arizona Avenue, Chandler, AZ 85248

Client: Uhaul

Designer: Huitt-Zollars, Inc.

Contractor: C and C Paving

Directions: I-10 West to Riggs Road. Take Riggs Road West to Arizona Avenue. Turn left on Arizona Avenue. The project is on the West side of Airzona Avenue (about 50 yards North of Riggs Road).

Location: Gravel pave is on the South side of the property in the parking lot.

Photography: Geosupply

Summary: Uhaul is looking to an environmentally friendly and cost effective way to handle their RV and overflow parking areas. They chose Gravelpave2 for many reasons: first the short term savings from minimizing their underground detention system; second is the long term savings in maintenance; third is the aesthetic and environmental benefits that they realize with a gravelpave2 parking lot. In some areas of the country they are “taxed” for stormwater runoff from their facilities. This is on the specifics of short term/immediate savings that they will realize from the Gravelpave2 parking lots Comprehensive study on this location is being done by Arizona State University.

This entry was posted in Arizona, Gravelpave2 and tagged , , , , , . Bookmark the permalink.

Comments are closed.