Project Name: Uhaul
Product: Gravelpave2 porous parking lot
Application: Parking Lot
City: Chandler
State/Province: Arizona
Install Date: July 2008
Install Size: 3,500 m2 (36,000 sq ft)
Address: 24908 South Arizona Avenue, Chandler, AZ 85248
Client: Uhaul
Designer: Huitt-Zollars, Inc.
Contractor: C and C Paving
Directions: I-10 West to Riggs Road. Take Riggs Road West to Arizona Avenue. Turn left on Arizona Avenue. The project is on the West side of Airzona Avenue (about 50 yards North of Riggs Road).
Location: Gravel pave is on the South side of the property in the parking lot.
Photography: Geosupply
Summary: Uhaul is looking to an environmentally friendly and cost effective way to handle their RV and overflow parking areas. They chose Gravelpave2 for many reasons: first the short term savings from minimizing their underground detention system; second is the long term savings in maintenance; third is the aesthetic and environmental benefits that they realize with a gravelpave2 parking lot. In some areas of the country they are “taxed” for stormwater runoff from their facilities. This is on the specifics of short term/immediate savings that they will realize from the Gravelpave2 parking lots Comprehensive study on this location is being done by Arizona State University.





