Search
The Germantown Fire Department required onsite testing for the Hospital fire lane installation. Invisible Structures recommends testing with grass grown on the system (with two weeks of rooting), however even without grass, this installation passed with flying colors. Even with the fully extended ladder, the outriggers are no match for the impressive 15,940 psi compressive strength of Grasspave2.
Location
Germantown
Install Size
19,400 sq ft (1800 sq m)
Designer
N/A
Contractor
Pro Green Landscapes