The project is part of a Lake and Pond Demonstration Grant from the Massachusetts Department of Conservation and Recreation to improve water quality through demonstration BMPs.
PRODUCTS USED:
Location Littleton
Install Size 2100 sq ft (200 sq m)
Designer Steven P. Roy, GeoSyntec Consultants, Inc.