This was a reconstruction project where an existing trailer park was demolished and new townhomes built. In order to comply with City of Dunedin and the State of Florida Stormwater runoff regulations, a detention system was needed. From initial excavation to completion of the installation, it took three days to create the Rainstore3 chamber that can hold up to 50,000 gallons of water.

PRODUCTS USED:

Rainstore3

Location
Dunedin, FL

Install Size
2000 units

Designer
Mike Palmer with Synergy

Contractor
Mark Douglas with Professional Site Development

The finished Rainstore3 bed, before the Geogrid layer. The Rainstore3 units are light enough to carry into place. Rainstore3 units arrive assembled on site for easy drop-in installation. Workers finish installing the Geogrid layer. Now all that's left is the base course on top.