Search
Due to Hilton Head Island regulations, the a UPS expansion at its hub facility required a porous parking lot and road. UPS performed an internal review between porous concrete and Gravelpave2. Installation time for porous concrete was 7 to 10 days, whereas Gravelpave2 was a maximum of 3 days. Porous concrete has only 2,800 psi compressive strength and Gravelpave2 has 15,940 psi. Gravelpave2 was also a third of the cost of pervious concrete. Daily maintenance was deemed too much for pervious concrete with an entire parking area and road lined with deciduous trees.
Location
Hilton Head Island
Install Size
6,800 sq ft (630 sq m)
Designer
Internal Designers at UPS
Contractor
N/A